1998 Annual Report - Capital Investments 1998 Accomplishments
We Add Switches to Supply More Numbers, Increase
Efficiency.
Our first expansion project (PalTel 1) has been completed and resulted in increasing
capacity to about 126,652 phone numbers, besides introducing 14 new switches. The second
expansion project (PalTel 2), has been concluded as well and resulted in enhancing the
efficiency of the TMX-100 switches operating in Nablus, Ramallah, Hebron and Gaza by
changing them into super nodes.
Our third expansion project (PalTel 3), is to construct
three switches in El-Bireh, Deir Qidies and Beit ‘Awa, besides installing and
operating eight additional RSUs. The preliminary capacity of these switches has reached
about 20,656 phone numbers. Within a short period of time telephony services in Palestine
have developed quantitatively and qualitatively due to executing the above-mentioned
projects as shown by the Development Indicators table.
Development Indicators
| Indicators |
Dec. 1996 |
Dec. 1998 |
Change rate |
| Exchanges |
14 |
28 |
100% |
| RSUs |
4 |
41 |
925% |
| Equipped Capacity |
89,958 |
232,005 |
158% |
| Served Localities |
48 |
210 |
338% |
| Operating Subscribers |
83,621 |
16,271 |
100% |
| Waiting lists |
206,000 |
156,248 |
24% |
Demand size
(subscribers + waiting lists) |
289,621 |
323,519 |
12% |
| Utilized capacity |
93% |
77% |
13% |
Penetration rate
(phone/100 inhabitant) |
3.4% |
5.9% |
73% |
Outside Plant Projects
PalTel has continually worked on providing telephone lines through access loops needed to
absorb the continuous expansion in switch capacity and the growing demand for telephony
services. The latest technologies are being deployed to meet this demand.
Cable and Wire Local Loop
The telephone network’s capacity has been expanded through fitting main and
subsidiary cables in about 156,112 lines distributed as follows:
| West Bank Region . . . . . . . |
106,096 |
| Gaza Region . . . . . . . . . . . |
50,016 |
| Total . . . . . . . . . . . . . . . . |
156,112 |
Hence, the additional capacity in the outside plant
projects during the past two years has reached about 210,000 lines.
Pair Gain Systems
The deployment of pair gain systems has proved to be the most practical and rapid solution
for solving the deficiency in telephone lines. Pair gain is usually used in city centers
where street density makes excavations difficult. The company’s option from the
outset for this solution was to fulfill the greatest number of applications possible that
have been outstanding for several years. Various capacities were utilized, thus availing a
total of 36,490 new phone lines.
Concentrators are being installed to
serve remote rural areas far from the main switching sites and populous locales. PalTel
has contracted to purchase such devices with various capacities, reaching about 20,000
lines in total.
Wireless Local Loop systems
provide the best economic and technical solutions by providing wireless telephone lines to
customers without the need to lay cables. As an initial step to provide telephony services
to some rural areas, PalTel has contracted to purchase several such systems with a
capacity of over 7,000 lines. These devices are being installed in several villages, in
which 1,300 new subscribers have already been added.
1999 Goals
New Switches from Alcatel and Nortel
In September, 1998 PalTel contracted with the French Company Alcatel for supplying,
installing and operating 28 main switches and 37 RSUs offering a total capacity of 187,440
phone numbers. Most of these switches are expected to be ready for operation by the end of
1999. Projected for installation in September 1999, PalTel has contracted with the
Canadian company Nortel to install and operate National & International Switches
(NISCs) in Gaza and Ramallah, plus National Switches in Nablus and Khan Yunis.
Current Switch Expansion
Current switches will be expanded to a total of about 42,348 phone numbers distributed as
shown on the Switch Expansion table. This project is aimed at providing the required
platform for adding calling cards and voice mail services. Following the conclusion of
these projects, switch capacity in Palestine will exceed 466,000 phone numbers.
Switch Expansion
|
Hebron switch . . . . . . . . . . . . . . .
Bethlehem switch . . . . . . . . . . . .
Ramallah switch . . . . . . . . . . . . .
Nablus switch . . . . . . . . . . . . . . .
Abu Deis switch . . . . . . . . . . . . .
Jericho switch . . . . . . . . . . . . . . .
Qalqiliya switch . . . . . . . . . . . . . .
Tulkarm switch . . . . . . . . . . . . . .
Deir El-Balah switch . . . . . . . . . .
Khan Yunis switch . . . . . . . . . . . .
Rafah switch . . . . . . . . . . . . . . . .
Total . . . . . . . . . . . . . . . . . . . . . |
10,864
7,680
5,820
2,560
1,280
640
1,024
2,240
2,560
5,120
2,560
42,348 |
|
Planning for the Year 2000
Although much of the equipment that it is being installed is new and allows for the smooth
transfer of data and records between 1999 and 2000, some of the existing telephony
equipment is older. To combat this, PalTel has undertaken an aggressive program to assure
that there will be no Y2K “bugs” when the millenium arrives.
The first stage has been a thorough inventory to isolate
problems. Each site in the West Bank and Gaza Regions were visited and a list of all
hardware, software, peripherals, and applications were documented including serial and
model/version numbers. All manufacturers and suppliers were requested to submit Y2K
compliance certificates for their equipment employed in PalTel’s network.
We wanted to determine the following:
 |
Which equipment may have a Y2K problem |
 |
Which have been tested and certified for Y2K
conformity |
 |
The severity of any problem found |
 |
What actions will be taken to insure that year
2000 status of all systems is achieved |
 |
That there is a system to audit the compliance
effort |
In follow-up meetings with the departments responsible for
the equipment in question, the following steps were taken:
 |
Equipment that could be affected by the Y2K
bug was identified and the person responsible for managing that equipment and putting it
into compliance was determined. |
 |
A copy of British Standard Institution Y2K
compliance requirements was shared and explained to the staff. The need to address the
potential problem in all new tenders/contracts was stressed. |
Results Are Excellent
The plan has been operating smoothly and Y2K compliance is under control.
Some examples:
Exchanges: Exchanges are a high
priority, naturally. The TMX10/100&RSUs are supplied by Telrad. A contract with Telrad
for Y2K compliance was signed on February 18, 1999. Implementation is underway. S12
exchanges were contracted for Y2K compliance with Alcatel.
New Switches &
RSUs Which are Contracted with Alcatel
|
Area |
No. of
Main Switches |
No. of
RSUs |
Equipped
Capacity |
|
1. Hebron |
8 |
8 |
30,216 |
|
2. Qalqiliya |
2 |
1 |
7,024 |
|
3. Nablus |
8 |
19 |
44,998 |
|
4. Tulkarm |
1 |
1 |
3,524 |
|
5. Jenin |
5 |
11 |
25,178 |
|
6. Gaza |
3 |
- |
39,500 |
|
7. Jabaliya |
1 |
- |
10,000 |
|
8. Deir el Balah |
1 |
- |
10,000 |
|
9. Khan Yunis |
1 |
- |
10,000 |
|
10. Rafah |
1 |
- |
7,000 |
|
Total |
31 |
40 |
187,440 |
Data Communications: Supplier TNN
(for equipment manufactured by Newbridge) was contracted for compliance. The upgrade was
finished at the end of April and Y2K compliance certificatification has been received.
Public Phones: Our supplier,
Interacom, has provided a confirmation letter that equipment is Y2K compliant. The same is
true for other systems components covering the concentrators: Oracle financial systems,
microwave links, pair gains systems, wireless local loop, office equipment, etc. Activity
is on-going regarding the IT Department Systems. We expect to finish this plan
successfully by the end of July 1999.
OUR VALUES
Managing, operating, and developing the Palestinian telecommunications sector is a
national duty, we are proficient at carrying this responsibility and proud of being
granted this honor. Ultimately, the customers’ satisfaction is our main concern, to
be achieved by: |
 |
Offering unique and competitive services and
developing these services continuously to meet present and future demands of our customers |
 |
Establishing strong and long-term relations
with our customers |
 |
Maintaining close contacts with our customers
to receive their comments/ ideas and re-evaluate the offered services continuously |
 |
Effective management and employees’ job
satisfaction, by adopting the following: |
|
- |
Teamwork spirit is essential in all locations
and management levels |
|
- |
Adopting new training and incentive policies
for enhancing creativity, innovation and development in all fields |
|
- |
Adopting a rewarding and appreciation policy
for unique performances and achievements |
|
- |
Development and modernization are both
individual and corporate responsibility at the same time |